This website stores data such as cookies to enable site functionality including analytics and personalisation. By using this website, you automatically accept that we use cookies.
As part of our month celebrating 20 years of the design and manufacture of our left foot accelerators, each week we will be sharing part of the process. This week it’s the manufacturing stage which is carried out by our engineering production team.
The manufacture of all our left foot accelerators takes place at our premises in Stockport, Greater Manchester.
The process begins with cutting each component before several engineering processes are completed to prepare each part for welding. On average, a left foot accelerator has 15 main components which are all part of an individual vehicle specific design. The components then go to one of our welders before being passed to the powder coating team to coat it for protection and aesthetics. All these processes take place in-house, enabling us to maintain quality and a quick response when orders are received. We asked one of the team their thoughts on the role they play in making the product.
“I’m really proud to use my engineering skills to produce the left foot accelerators as it is good to know you’re creating something which is making a difference to someone.”
Once these stages of the manufacturing process are completed, the left foot accelerator leaves our production team and is handed over to the assembly team.